Black Sand Basin to Old Faithful

Take Grand Loop Road → Old Faithful area roads. The plan carries 5 minutes of road-delay buffer here.

Old Faithful overpass work is borderline for the trip date

The published window says mid-July through mid-August with delays up to 15 minutes. August 19 is just outside that imprecise window, so no delay is applied, but the project must be rechecked.

Checked Jul 26, 2026

Drive

5min

Buffer

+5min

Distance

Distance varies

Buffers model road and construction delays only. Parking time is carried by the destination stop.

Narration

Prediction ahead

Transcript

Watch for

  • Old Faithful overpass work
  • Parking-lot signs
  • Pedestrian crossings

Arrival cue

Large signed lots, the visitor center, lodges, and the Inn mark the Old Faithful complex.

Passenger reads this

  • Yield to heavy pedestrian traffic.
  • Do not rush or park illegally to catch an eruption.

Road facts

Old Faithful overpass schedule
Up to 15-minute delays from mid-July through mid-August 2026
Content checked 2026-07-26high confidence
Arriving atOld Faithful & the Inn