Old Faithful to Kepler Cascades

Take Grand Loop Road. The plan carries 15 minutes of road-delay buffer here.

Firehole River Bridge work south of Old Faithful

NPS lists delays up to 15 minutes from August through mid-September. This allowance is already included in the segment buffer.

Checked Jul 26, 2026

Drive

10min

Buffer

+15min

Distance

Distance varies

Buffers model road and construction delays only. Parking time is carried by the destination stop.

Narration

Past the Firehole bridge

Transcript

Watch for

  • Firehole River Bridge flaggers
  • Kepler Cascades pullout
  • Southbound traffic

Arrival cue

A signed roadside pullout and level boardwalk mark Kepler Cascades.

Passenger reads this

  • Expect a 15-minute construction hold.
  • Let eruption traffic disperse rather than following too closely.

Road facts

Firehole River Bridge
Up to 15-minute delays, August–mid-September 2026
Inn fire survival
Evacuated during the 1988 North Fork Fire and preserved
Content checked 2026-07-26verified confidence
Arriving atKepler Cascades