Back

Road chapter

West Thumb to Lake Yellowstone Hotel

Take Grand Loop Road. The plan carries 15 minutes of road-delay buffer here.

Bridge Bay bridge work

NPS lists delays up to 15 minutes in the Bridge Bay area from mid-August through November 2026. This allowance is already included in the segment buffer.

Checked Jul 26, 2026

Drive

35min

Buffer

+15min

Distance

Distance varies

Buffers model road and construction delays only. Parking time is carried by the destination stop.

Narration

Along Yellowstone Lake

Transcript

Watch for

  • Yellowstone Lake shore
  • Bridge Bay work zone
  • Lake Village signs

Arrival cue

The large pale-yellow hotel with white columns appears near the lakeshore in Lake Village.

Passenger reads this

  • Expect up to 15 minutes of Bridge Bay construction delay.
  • Do not stop on the road for lake photographs; use signed pullouts.
  • Strong crosswinds can develop along open water.

Road facts

Bridge Bay construction
Up to 15-minute delays, mid-August–November 2026
Native fish
Largest Yellowstone cutthroat trout population in North America
Content checked 2026-07-26verified confidence
Arriving atLake Yellowstone Hotel